Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Nov 27, 2006     Aileron brackets; Aileron stops - (1.6 hours)       Category: Wings
Drilled out all four aileron attach brackets (A-406s and A-407-Ls) and re-primed. Bolted two of them to left aileron. Test-hung L aileron on wing.

Fabricated two A-914 aileron control stops from 1x1 angle in accordance with plans. (Hand-cut the angle stock due to odd behavior from bandsaw -- the blade would not track straight through the material, despite using a fence and being well-supported. I suspect it needs to be tightened a bit.)


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.